Development of Comprehensive Treatment Process for High Salt and High COD Wastewater from Hyposulfonamide Accelerator Production
Received:June 01, 2021  Revised:June 01, 2021
DOI:10.12136/j.issn.1000-890X.2022.09.0704
Key Words: hyposulfonamide accelerator;production wastewater;resin adsorption;catalytic wet oxidation;ozone oxidation;evaporation concentration;comprehensive treatment
Author NameAffiliationE-mail
MENG Qingsen* Kemai Chemical Co.,Ltd my_201@126.com 
Hits: 556
Download times: 433
Abstract:
      In this work, 100% resource utilization of high salt and high chemical oxygen demand(COD) wastewater from hyposulfonamide accelerator production was achieved by organically combining the resin adsorption process,catalytic wet oxidation process,ozone oxidation process and evaporation concentration process.The wastewater treatment steps were as follows:Organic amine raw materials in the production wastewater were absorbed and recovered by resin adsorption,COD was reduced by catalytic wet oxidation and ozone oxidation,then the heavy metal ions,calcium ion and magnesium ion were removed by multi-stage resin adsorption,and at the last step,evaporation concentration was carried out.The obtained treated water met the primary influent standard of ion-exchange membrane caustic soda.With this process,zero emission of wastewater from accelerator production was realized.
View Full Text   View/Add Comment  Download reader
Close